North Main Street over M FORK HOLSTON RIVER @

1.57 M.WCL 1.8 M.ECL · County 173, Virginia · Built 1941 · 4 Lanes · 12,936 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000020613
Year Built
1941
Reconstructed
1983
Length
28.7 m (94.2 ft)
Max Span
28 m
Width
23.9 m (78.4 ft)
Lanes
4
Daily Traffic
12,936
Material
Other
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$549,150,000
Total Project Cost
$746,395,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.