Big Bethel Road over I-64

1.70 Mi To Hampton Line · County 650, Virginia · Built 1989 · 4 Lanes · 17,817 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000000000020287
Year Built
1989
Length
87.5 m (287.1 ft)
Max Span
31.1 m
Width
23.2 m (76.1 ft)
Lanes
4
Daily Traffic
17,817
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$100,000,000
Total Project Cost
$120,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.