US23(GILLEY AVE.E) over SOUTH FORK POWELL RIVER

002958 ALT 0049SCL-B-S- · County 195, Virginia · Built 1934 · 2 Lanes · 13,041 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000019968
Year Built
1934
Length
29.7 m (97.4 ft)
Max Span
9.9 m
Width
9.6 m (31.5 ft)
Lanes
2
Daily Traffic
13,041
Material
Concrete
Design
Tee Beam
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$300,000,000
Total Project Cost
$412,500,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.