SBL395;HOV;Bus;CD over 4 MiIe RUN

01.20FR7/00.20TO120 · County 013, Virginia · Built 1973 · 9 Lanes · 82,346 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000019959
Year Built
1973
Reconstructed
2018
Length
35.1 m (115.2 ft)
Max Span
17.4 m
Width
67.4 m (221.1 ft)
Lanes
9
Daily Traffic
82,346
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$40,000,000
Total Project Cost
$179,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.