ROUTE 23B over NS RAILWAY

.43M TO 78 & .11M TO 68 · County 195, Virginia · Built 1937 · 2 Lanes · 6,507 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
000000000019249
Year Built
1937
Reconstructed
2009
Length
39 m (128 ft)
Max Span
21 m
Width
14.2 m (46.6 ft)
Lanes
2
Daily Traffic
6,507
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$330,000,000
Total Project Cost
$468,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.