Cabin Point Road over Dobie Swamp

2.80 TO 35 / 3.30 TO 625 · County 183, Virginia · Built 1974 · 2 Lanes · 554 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
000000000018295
Year Built
1974
Length
8.3 m (27.2 ft)
Max Span
1.9 m
Lanes
2
Daily Traffic
554
Material
Steel
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.