I-95 SBL over Galley Swamp

1.60 Mi To Route 40 · County 183, Virginia · Built 1980 · 2 Lanes · 19,764 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
000000000018275
Year Built
1980
Length
6.7 m (22 ft)
Max Span
1.2 m
Lanes
2
Daily Traffic
19,764
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.