Route 58 EBL over Nottoway River

1.80 TO 35 / 1.48 TO 742 · County 175, Virginia · Built 1984 · 2 Lanes · 8,595 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000017749
Year Built
1984
Length
365.8 m (1200.1 ft)
Max Span
18.3 m
Width
12.7 m (41.7 ft)
Lanes
2
Daily Traffic
8,595
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$518,000,000
Total Project Cost
$725,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.