ROUTE 81 over NBL&SBL OVER STREAM

6.97 TO R11; .08 TO R683 · County 173, Virginia · Built 1964 · 4 Lanes · 27,803 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
000000000017495
Year Built
1964
Length
8.8 m (28.9 ft)
Max Span
2.7 m
Lanes
4
Daily Traffic
27,803
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$40,000,000
Total Project Cost
$78,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.