INTERSTATE 81 NBL over RAMP A & FR-7

2.44 FR 16; 8.0 TO 107 · County 173, Virginia · Built 1962 · 2 Lanes · 16,655 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000017432
Year Built
1962
Reconstructed
1993
Length
55.5 m (182.1 ft)
Max Span
13.9 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
16,655
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$530,000,000
Total Project Cost
$754,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.