SENEDO RD over SWOVER CREEK

0.10 TO 691 - 0.75 TO 703 · County 171, Virginia · Built 1952 · 2 Lanes · 2,029 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000016972
Year Built
1952
Reconstructed
2008
Length
7.5 m (24.6 ft)
Max Span
6.4 m
Width
8.1 m (26.6 ft)
Lanes
2
Daily Traffic
2,029
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$77,000,000
Total Project Cost
$88,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.