S MAIN ST-WOODSTCK over SPRING HOLLOW RUN

1.07 NCL WDSTK-0.43 TO 42 · County 171, Virginia · Built 1932 · 2 Lanes · 10,296 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000016953
Year Built
1932
Length
11 m (36.1 ft)
Max Span
5.5 m
Width
20.2 m (66.3 ft)
Lanes
2
Daily Traffic
10,296
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.