NATURAL TUNNEL PKY over STREAM

.15M TO 874 & .30M TO 812 · County 169, Virginia · Built 1932 · 2 Lanes · 562 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000016939
Year Built
1932
Reconstructed
2010
Length
7 m (23 ft)
Max Span
6.4 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
562
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$59,800,000
Total Project Cost
$110,240,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.