METHODIST CAMP LN over STONY CREEK

.11 FR 619 -.19 TO E MAIN · County 169, Virginia · Built 1977 · 2 Lanes · 75 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000016903
Year Built
1977
Length
29.3 m (96.1 ft)
Max Span
9.4 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
75
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$134,050,000
Total Project Cost
$206,765,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.