EAST POINT RD over S FORK SHENANDOAH RIVER

0.42 TO 947 - 0.20 TO 707 · County 165, Virginia · Built 1954 · 2 Lanes · 4,443 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000015914
Year Built
1954
Length
222.1 m (728.7 ft)
Max Span
45.7 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
4,443
Material
Steel
Design
Truss - Thru
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$263,000,000
Total Project Cost
$270,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.