ROUTE 33 BUSINESS over S F SHENANDOAH RIVER

0.01 RT 635- 0.29 WCL ELK · County 165, Virginia · Built 1939 · 2 Lanes · 6,429 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000015757
Year Built
1939
Reconstructed
1995
Length
176.4 m (578.7 ft)
Max Span
30.5 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
6,429
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,000,000
Total Project Cost
$3,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.