CHESTNUT GROVE TRL over GILMER CREEK

0.25 TO 626 & 0.45 TO 627 · County 163, Virginia · Built 1970 · 2 Lanes · 183 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000015466
Year Built
1970
Reconstructed
2014
Length
9.1 m (29.9 ft)
Max Span
8.3 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
183
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$75,000,000
Total Project Cost
$180,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.