EAST MIDLAND TRAIL over MAURY RIVER

.02 TO 608E & .58 TO 608W · County 163, Virginia · Built 1984 · 2 Lanes · 10,740 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
000000000015217
Year Built
1984
Length
178.2 m (584.6 ft)
Max Span
31.7 m
Width
19.3 m (63.3 ft)
Lanes
2
Daily Traffic
10,740
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$140,000,000
Total Project Cost
$180,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.