81SB Rp to 581 SBL over UNDR 81NB & ovr 581SB Rp

0.18-SBL 81; 1.07-RT117 · County 161, Virginia · Built 1963 · 2 Lanes · 4,401 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
000000000014893
Year Built
1963
Reconstructed
1990
Length
48.8 m (160.1 ft)
Max Span
17.1 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
4,401
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$476,500,000
Total Project Cost
$169,170,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.