JAMES MADISON HWY. over BRANCH OF CHESTNUT LICK

00.67 701 / 01.05 686 · County 153, Virginia · Built 1935 · 2 Lanes · 15,542 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000014176
Year Built
1935
Reconstructed
1994
Length
7.5 m (24.6 ft)
Max Span
5.4 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
15,542
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$200,000,000
Total Project Cost
$230,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.