JEFFERSON DAVIS HY over POWELLS CREEK

00.51FR1901 00.20TO2550 · County 153, Virginia · Built 1926 · 4 Lanes · 39,004 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000014159
Year Built
1926
Length
10.1 m (33.1 ft)
Max Span
10.1 m
Width
14.4 m (47.2 ft)
Lanes
4
Daily Traffic
39,004
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$350,000,000
Total Project Cost
$410,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.