Pat Henry Hwy EBL over NS Railway

1.20-Rt 628 / 0.13-Rt 630 · County 147, Virginia · Built 1931 · 2 Lanes · 2,380 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000013896
Year Built
1931
Length
40.2 m (131.9 ft)
Max Span
12.5 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
2,380
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$805,000,000
Total Project Cost
$120,800,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.