US 29 Highway over Pumpkin Creek

1.15 TO 1123 - 0.60 TO 86 · County 143, Virginia · Built 1980 · 4 Lanes · 17,352 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
000000000013515
Year Built
1980
Length
14.9 m (48.9 ft)
Max Span
3.5 m
Lanes
4
Daily Traffic
17,352
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$256,800,000
Total Project Cost
$385,200,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.