Rt 29 NBL Bypass over Route 1353

0.36-29N Bus/0.32-Rt.786 · County 143, Virginia · Built 1980 · 3 Lanes · 8,804 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000013513
Year Built
1980
Reconstructed
2002
Length
31.3 m (102.7 ft)
Max Span
29.8 m
Width
17.8 m (58.4 ft)
Lanes
3
Daily Traffic
8,804
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$112,746,000
Total Project Cost
$169,119,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.