Jeb Stuart Hwy/58 over Mayo River

0.27-RT 8;14.50-Floyd Co · County 141, Virginia · Built 1929 · 2 Lanes · 1,996 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000013219
Year Built
1929
Length
11.4 m (37.4 ft)
Max Span
10.8 m
Width
7.8 m (25.6 ft)
Lanes
2
Daily Traffic
1,996
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$693,000,000
Total Project Cost
$221,600,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.