ROUTE 13 SBL over FISHERMAN INLET

1.51NHMPTN CO1723NCL VA B · County 131, Virginia · Built 1964 · 2 Lanes · 5,424 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 7 Good
Substructure 7 Good

Location

37.117289, -75.968808

This bridge is in worse condition than 8.3% of bridges in County 131. The average bridge in Virginia is 0 years old; this one is 62 years old.

Nearby Bridges

Bridge Details

Structure #
000000000012753
Year Built
1964
Length
642.5 m (2107.9 ft)
Max Span
53.3 m
Width
10 m (32.8 ft)
Lanes
2
Daily Traffic
5,424
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$825,000,000
Total Project Cost
$123,750,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.