Radford Rd.[RT 11] over Plum Creek

4.00-WCL CHRI; .02-RT792 · County 121, Virginia · Built 1925 · 3 Lanes · 8,591 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000012110
Year Built
1925
Reconstructed
2007
Length
14.3 m (46.9 ft)
Max Span
12.8 m
Width
13.7 m (44.9 ft)
Lanes
3
Daily Traffic
8,591
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$835,000,000
Total Project Cost
$271,400,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.