HWY-NINE-O-THREE over CSX RAILWAY (ABANDONED)

.03 FR 1401 & .27 TO 619 · County 117, Virginia · Built 1968 · 2 Lanes · 5,402 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000012080
Year Built
1968
Length
38.7 m (127 ft)
Max Span
37.7 m
Width
9.7 m (31.8 ft)
Lanes
2
Daily Traffic
5,402
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$190,500,000
Total Project Cost
$241,500,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.