U. S. 58 (WBL) over NUMBER THREE BRANCH

.23 FR 732 & .28 TO 735 · County 117, Virginia · Built 1971 · 2 Lanes · 5,092 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000011902
Year Built
1971
Length
30.2 m (99.1 ft)
Max Span
29.5 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
5,092
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$150,000,000
Total Project Cost
$226,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.