JOHN CLAYTON MEM. over NORTH END BRANCH

6.2M RTE198-0.9M RTE3 · County 115, Virginia · Built 1949 · 2 Lanes · 6,559 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
000000000011835
Year Built
1949
Length
29.9 m (98.1 ft)
Max Span
10.1 m
Width
8.4 m (27.6 ft)
Lanes
2
Daily Traffic
6,559
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$500,000,000
Total Project Cost
$650,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.