SOUTH HILL ROAD over TOBACCO HERITAGE TR

.1 TO 605 & 1.4 TO 138 · County 111, Virginia · Built 1957 · 2 Lanes · 3,441 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000011575
Year Built
1957
Length
44.8 m (147 ft)
Max Span
14.1 m
Width
8.3 m (27.2 ft)
Lanes
2
Daily Traffic
3,441
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$375,000,000
Total Project Cost
$515,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.