JOHN S. MOSBY HWY over LENAH RUN

.20mi Fr 600/.70mi To 616 · County 107, Virginia · Built 1935 · 2 Lanes · 19,730 vehicles/day

Overall
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000011127
Year Built
1935
Length
6.9 m (22.6 ft)
Max Span
6.2 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
19,730
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$500,000,000
Total Project Cost
$560,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.