RAMP A OF RTE. 28 over RAMP D OF ROUTE 7

0.50 Fr 638/0.15 To 7 WBL · County 107, Virginia · Built 1991 · 2 Lanes · 36,769 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000011113
Year Built
1991
Length
36.9 m (121.1 ft)
Max Span
36.9 m
Width
12.1 m (39.7 ft)
Lanes
2
Daily Traffic
36,769
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$44,000,000
Total Project Cost
$150,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.