ROUTE 0421 over POWELL RIVER

.23 FR 785- 2.40 TO 58ALT · County 105, Virginia · Built 1934 · 2 Lanes · 5,457 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000010763
Year Built
1934
Reconstructed
1995
Length
70.1 m (230 ft)
Max Span
39.6 m
Width
9 m (29.5 ft)
Lanes
2
Daily Traffic
5,457
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$452,000,000
Total Project Cost
$848,300,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.