SBL I-95 over SOUTH ANNA RIVER

3.57 TO 54 & 2.49 TO 30 · County 085, Virginia · Built 1963 · 3 Lanes · 55,390 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000009404
Year Built
1963
Reconstructed
1982
Length
94.5 m (310 ft)
Max Span
25.5 m
Width
18.8 m (61.7 ft)
Lanes
3
Daily Traffic
55,390
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.