Meadville Road over Banister River

0.34 TO 833 - 0.10 TO 888 · County 083, Virginia · Built 1959 · 2 Lanes · 1,156 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000009253
Year Built
1959
Length
74.3 m (243.8 ft)
Max Span
27.3 m
Width
8.9 m (29.2 ft)
Lanes
2
Daily Traffic
1,156
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$153,216,000
Total Project Cost
$229,824,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.