James D Hagood Hwy over Difficult Creek

1.92-Rt 344/0.46-Rt 607 · County 083, Virginia · Built 1965 · 2 Lanes · 3,902 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000009190
Year Built
1965
Length
35 m (114.8 ft)
Max Span
10.5 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
3,902
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$124,982,000
Total Project Cost
$187,473,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.