GRAYSON PKWY over PEACH BOTTOM CREEK

.79 TO R888 & .49 TO R849 · County 077, Virginia · Built 1974 · 2 Lanes · 5,774 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
5
Fair

Bridge Details

Structure #
000000000008723
Year Built
1974
Reconstructed
2010
Length
49.1 m (161.1 ft)
Max Span
16.5 m
Width
14.4 m (47.2 ft)
Lanes
2
Daily Traffic
5,774
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$190,000,000
Total Project Cost
$273,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.