WBL ROUTE 0460 over RT 460 BUS

2.6-Va Ave RMP;1.5 Rt 635 · County 071, Virginia · Built 1981 · 2 Lanes · 7,735 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000008381
Year Built
1981
Length
64.9 m (212.9 ft)
Max Span
32 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
7,735
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.