WARDENSVILLE PIKE over DUCK RUN

0.12 TO 603 - 0.07 TO 608 · County 069, Virginia · Built 1941 · 2 Lanes · 3,060 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000008107
Year Built
1941
Length
35.7 m (117.1 ft)
Max Span
19.2 m
Width
8.4 m (27.6 ft)
Lanes
2
Daily Traffic
3,060
Material
Concrete
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$169,000,000
Total Project Cost
$187,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.