NORTHWESTRN PK-EBL over BACK CREEK

0.04 TO 752 - 0.35 TO 688 · County 069, Virginia · Built 1964 · 2 Lanes · 6,641 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000008106
Year Built
1964
Length
35.1 m (115.2 ft)
Max Span
11.6 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
6,641
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$104,000,000
Total Project Cost
$115,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.