CAPITAL BELTWAY over BRANCH OF CAMERON RUN

0.20FR1 1.20TO241 · County 059, Virginia · Built 1961 · 8 Lanes · 196,510 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
000000000006444
Year Built
1961
Length
12.8 m (42 ft)
Max Span
3 m
Lanes
8
Daily Traffic
196,510
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$46,000,000
Total Project Cost
$150,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.