CAPITAL BELTWAY over TRIB.OF CAMERON RUN

02.23FR613/00.96TO241 · County 059, Virginia · Built 1964 · 8 Lanes · 199,971 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
000000000006417
Year Built
1964
Length
6.4 m (21 ft)
Max Span
2.1 m
Lanes
8
Daily Traffic
199,971
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,000,000
Total Project Cost
$2,500,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.