CAPITAL BELTWAY over VAN DORN ST. (RTE. 613)
02.16FR.I395/03.21TO241 · County 059, Virginia · Built 1964 · 10 Lanes · 186,746 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
38.796264, -77.135553
This bridge is in worse condition than 89.9% of bridges in County 059. The average bridge in Virginia is 0 years old; this one is 62 years old.
Nearby Bridges
VAN DORN RAMPS B&C over CAPITAL BELTWAY & RTE 95
Built 1964
Van Dorn Street over NS RR & Metro Road
Built 1984
VAN DORN STREET over BACKLICK CREEK
Built 1932
EDSALL ROAD over TURKEYCOCK CREEK
Built 1982
BREN MAR DRIVE over INDIAN RUN
Built 1961
SB 95 over CSX R.R. & METRO RAIL
Built 2004
Capital Beltway over METRO & CSX RAILWAY
Built 2001
EDSALL ROAD over INDIAN RUN
Built 1964
ROUTE 0395 over TURKEY COCK RUN
Built 1967
RAMP THN over RTE.395 NB AND RAMP F
Built 2014
Bridge Details
- Structure #
- 000000000006411
- Year Built
- 1964
- Length
- 49.4 m (162.1 ft)
- Max Span
- 23.5 m
- Width
- 47.5 m (155.8 ft)
- Lanes
- 10
- Daily Traffic
- 186,746
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $449,100,000
- Total Project Cost
- $500,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.