LEESBURG PIKE WB over SUGARLAND RUN

0.15 Fr 228/0.20 To 286 · County 059, Virginia · Built 1947 · 3 Lanes · 37,893 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000006235
Year Built
1947
Reconstructed
2021
Length
25.8 m (84.6 ft)
Max Span
12.9 m
Width
18.3 m (60 ft)
Lanes
3
Daily Traffic
37,893
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$150,000,000
Total Project Cost
$500,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.