N&SBL TIDEWATER TR over PISCATAWAY CREEK

2.2M RTE360-11.2M MDSEX C · County 057, Virginia · Built 1994 · 4 Lanes · 6,979 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000006141
Year Built
1994
Length
99.7 m (327.1 ft)
Max Span
19.8 m
Width
26.8 m (87.9 ft)
Lanes
4
Daily Traffic
6,979
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,000,000
Total Project Cost
$3,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.