BALTIMORE ROAD over GEORGES BRANCH

0.60 Fr694 &1.50 To Ameli · County 053, Virginia · Built 1975 · 2 Lanes · 1,098 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
5
Fair
Substructure
4
Poor

Bridge Details

Structure #
000000000006046
Year Built
1975
Length
10.7 m (35.1 ft)
Max Span
10.2 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
1,098
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$200,000,000
Total Project Cost
$230,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.