COMMISSION CIR. over STREAM

0.25 FR 702& 0.35 TO 734 · County 051, Virginia · Built 1932 · 1 Lanes · 62 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000005904
Year Built
1932
Reconstructed
2008
Length
12.8 m (42 ft)
Max Span
12.2 m
Width
6.2 m (20.3 ft)
Lanes
1
Daily Traffic
62
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$76,000,000
Total Project Cost
$131,300,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.