LOWER GEORGES FORK over GEORGES FORK RIVER

2.65 TO R83& 2.25 TO R631 · County 051, Virginia · Built 1988 · 2 Lanes · 569 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000005849
Year Built
1988
Length
9.8 m (32.2 ft)
Max Span
9.4 m
Width
8 m (26.2 ft)
Lanes
2
Daily Traffic
569
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$35,000,000
Total Project Cost
$65,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.