BUNDLE ROAD over SECOND BRANCH

1.99 FR 602 & 1.17 TO 626 · County 041, Virginia · Built 1974 · 2 Lanes · 1,847 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000005305
Year Built
1974
Reconstructed
2007
Length
9.8 m (32.2 ft)
Max Span
8.7 m
Width
6.2 m (20.3 ft)
Lanes
2
Daily Traffic
1,847
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$200,000,000
Total Project Cost
$255,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.